Skip to content
Rebate Clock

Enphase IQ Battery 5P rebate

Checked against the approved list

1 × IQ Battery 5P, the smallest listed size

Waiting past 31 Dec 2026 costs $240

With 5 kWh units, the IQ Battery 5P lets you stop where the rebate rate drops: two units collect the full rate on every kilowatt-hour, and a third still earns nearly as much. For installs after October, check that the quote names the FlexPhase model.

Try your own numbers

Your battery and install date
Installed by 31 Dec 2026$1,360
Installed from 1 Jan 2027$1,120
Waiting costs you−$240

34 certificates × $40 for 5 kWh usable, at the May–Dec 2026 factor of 6.8. 28 certificates from 1 Jan 2027.

The factor is set by the date on the electrical compliance certificate, not the date you sign the quote.

19 batteries, every install date

Compare batteries
State and price
For state top-ups; the federal rebate is the same everywhere.
Price per certificate

The clock: this battery’s rebate by install date

  1. May–Dec ’26$1,360
  2. Jan–Jun ’27$1,120
  3. Jul–Dec ’27$1,040
  4. Jan–Jun ’28$920
  5. Jul–Dec ’28$800
  6. Jan–Jun ’29$720
  7. Jul–Dec ’29$600
  8. Jan–Jun ’30$520
  9. Jul–Dec ’30$400

How the size taper applies

  • First 14 kWh at 100%5 kWh
  • 14 to 28 kWh at 60%0 kWh
  • 28 to 50 kWh at 15%0 kWh

Get quotes from more than one accredited installer, and ask each to show the STC discount as its own line.

Updated 3 Oct 2026 · every figure links to its source · No provider pays us to be listed.

Enphase's IQ Battery 5P is a 5 kWh unit that you add one at a time. The current FlexPhase version is listed to the end of 2027; the original IQ Battery 5P listing expires on 29 October 2026.

IQ Battery 5P rebate by install date

Size (usable)May–Dec ’26Jan–Jun ’27Jul–Dec ’27Jan–Jun ’28Jul–Dec ’28Jan–Jun ’29Jul–Dec ’29Jan–Jun ’30Jul–Dec ’30
1 × IQ Battery 5P5 kWh$1,360$1,120$1,040$920$800$720$600$520$400
2 × IQ Battery 5P10 kWh$2,720$2,280$2,080$1,840$1,640$1,440$1,240$1,040$840
3 × IQ Battery 5P15 kWh$3,960$3,320$3,000$2,680$2,360$2,080$1,800$1,480$1,200
4 × IQ Battery 5P20 kWh$4,760$4,000$3,640$3,200$2,880$2,520$2,160$1,800$1,440
At $40 a certificate, excluding GST.

What each step up adds in 2026

SizeAddsRebatePer kWh
2 × IQ Battery 5P 5 kWh +$1,360 $272
3 × IQ Battery 5P 5 kWh +$1,240 $248
4 × IQ Battery 5P 5 kWh +$800 $160

IQ Battery 5P listings

SizeModel numberNominalUsableListed until
1 × IQ Battery 5P IQBATTERY-5P-3P-INT-3.84-1P (AS4777-2 2020) 5 kWh 5 kWh 31 Dec 2027
2 × IQ Battery 5P 2 × IQBATTERY-5P-3P-INT-3.84-1P (AS4777-2 2020) 10 kWh 10 kWh 31 Dec 2027
3 × IQ Battery 5P 3 × IQBATTERY-5P-3P-INT-3.84-1P (AS4777-2 2020) 15 kWh 15 kWh 31 Dec 2027
4 × IQ Battery 5P 4 × IQBATTERY-5P-3P-INT-3.84-1P (AS4777-2 2020) 20 kWh 20 kWh 31 Dec 2027

How the IQ Battery 5P sizes land on the taper

Each unit is listed at 5 kWh nominal and 5 kWh usable. Two units give 10 kWh and three give 15 kWh; units installed together in one job count as one battery system for the rebate.

With one or two units, the whole capacity earns the full factor. The third unit crosses 14 kWh, so 4 kWh of it earns the full factor and 1 kWh earns 60%. A fourth unit earns 60% throughout.

Two listings exist. The original IQ Battery 5P (certificate BAT-404) is listed until 29 October 2026, so units certified after that date need the FlexPhase model (BAT-646, listed until 31 December 2027) unless the original listing is renewed. The table uses the FlexPhase listing.

Other Enphase batteries on the list

Enphase lists only the IQ Battery 5P in Australia: one original model and ten FlexPhase variants that differ by inverter output (1.65 to 3.84 kW) and phase, every one at 5 kWh usable. Whichever variant the installer fits, each unit earns the same certificates.

Before you sign for a IQ Battery 5P

  • Check the model on the quote starts IQBATTERY-5P (the FlexPhase version). The original IQ Battery 5P, model B05-T02, is listed only until 29 October 2026.
  • Each unit is 5 kWh usable, so the rebate is easy to check: two units should show the same certificates as any other 10 kWh-usable battery.
  • Units added later only qualify if the first ones never claimed the discount, so plan the number of units before the first install.

Rebate calculator · Eligibility rules