BYD Battery-Box Premium HVS rebate
Checked against the approved list
Listed until 17 January 2027. Installs after that need a renewed listing to earn certificates; rule 1.
HVS 5.1, the smallest listed size
Waiting past 31 Dec 2026 costs $200
The HVS is the simplest battery here to price: its rebate rises with size at the full rate. Its limit is capacity, not the taper, because at 12.8 kWh it stops before the rate would fall.
Try your own numbers
Updated 3 Oct 2026 · every figure links to its source · No provider pays us to be listed.
BYD's Battery-Box Premium HVS stacks 2.56 kWh modules from 5.1 to 12.8 kWh, so every size sits inside the full-factor band. Its listing runs to 17 January 2027.
| Size (usable) | May–Dec ’26 | Jan–Jun ’27 | Jul–Dec ’27 | Jan–Jun ’28 | Jul–Dec ’28 | Jan–Jun ’29 | Jul–Dec ’29 | Jan–Jun ’30 | Jul–Dec ’30 |
|---|---|---|---|---|---|---|---|---|---|
| HVS 5.15.12 kWh | $1,360 | $1,160 | $1,040 | $920 | $800 | $720 | $600 | $520 | $400 |
| HVS 7.77.68 kWh | $2,080 | $1,720 | $1,560 | $1,400 | $1,240 | $1,080 | $920 | $760 | $640 |
| HVS 10.210.24 kWh | $2,760 | $2,320 | $2,120 | $1,880 | $1,640 | $1,440 | $1,240 | $1,040 | $840 |
| HVS 12.812.8 kWh | $3,480 | $2,880 | $2,640 | $2,320 | $2,080 | $1,840 | $1,560 | $1,320 | $1,040 |
What each step up adds in 2026
| Size | Adds | Rebate | Per kWh |
|---|---|---|---|
| HVS 7.7 | 2.56 kWh | +$720 | $281 |
| HVS 10.2 | 2.56 kWh | +$680 | $266 |
| HVS 12.8 | 2.56 kWh | +$720 | $281 |
How the Battery-Box Premium HVS sizes land on the taper
No HVS size reaches 14 kWh, so every kilowatt-hour of every size earns the full STC factor. That makes the HVS rebate a straight line: about the same dollars per kilowatt-hour whether the stack has two modules or five.
Usable equals nominal on the CEC listing. The certificate (BAT-489) is listed until 17 January 2027, a little over two weeks after the step-down; HVS batteries certified after that date need a renewed listing to earn certificates.
Other BYD batteries on the list
The HVS is BYD's smaller high-voltage stack. Past 12.8 kWh the step up is a different BYD range rather than another HVS module: the HVM or HVM+ (to 22.1 kWh) or the newer HVB (to 29.7 kWh), each under its own listing and expiry date.
Before you sign for a Battery-Box Premium HVS
- Check the quote names an HVS size from 5.1 to 12.8. Anything bigger is a different BYD range with a different listing.
- If your install could slip into the second half of January 2027, ask the installer to confirm the HVS listing has been renewed past 17 January.
- An HVS stack can't reach the 60% band, so adding a module never costs you rebate rate; the only question is whether you need the capacity.